Bella Vista All Weather Track Project Pictures
![]() |
![]() |
| Rubber/urathane mixing machine. | |
![]() |
![]() |
| Laying rubber on east pole vault runnway. | Laying rubber on east pole vault runnway. |
![]() |
![]() |
| Laying rubber on east pole vault runnway. | Spraying primer on north track surface. |
![]() |
![]() |
| Spraying primer on north track surface. | First rubber paving east side. |
![]() |
![]() |
| Rubber paving machine. | Starting to pave south turn. |
![]() |
![]() |
| Finishing paving south turn. | High jump apron |
![]() |
![]() |
| Long/Triple jump runways being surfaced | |
![]() |
|
| Finishing up the base rubber under the lights (3-25-02) | |