Home     Up

Bella Vista All Weather Track Project Pictures


4 pictures above - Teichert Inc. removing unsuitable soil from "Taft Creek" east side.
Left - beginning to lay "petra-mat" down in low, soft area by visitor stands. Right - "petra-mat" down across width of track followed by gravel.
Preparing the most important area, the high jump area north side. Mount Nishimura grows!
Mixing lime into gravel to stabilize sub-grade.