Home    Up

Bella Vista All Weather Track Project Pictures


           
Date Click For Pictures Date Click For Pictures Date Click For Pictures
11-3-01 Boxcar Removal   1-8-02 & 1-15-02 Long and Triple Jump Runway Construction   3-12-02 New Fence And Rubber Surface Preparation
11-12-01 Curb Demo   1-15-02 Shot Put Ring Construction 3-14-02 to 3-25-02  Preparing and Laying the Base Rubber
11-14-01 High Jump/Shot Put Area Grading 1-16-02 to 1-18-02 East Retaining Wall Construction 3-26-02 Spreading the sealing rubber
12-4-01 New Curb Preparation   1-29-02 Unsuitable Soil Fix and Asphalt Base 3-29-02 to 3-31-02 Top Layer
12-11-01 Digging Jump Pits and Start of Final Grade 1-30-02 to 2-4-02 Asphalt Base  4-7-02 to 4-8-02 Track Lined
12-12-01 Final Track Surface Grade and Jump Pits Grading 2-11-02 Fourth Patch and High Jump Asphalted 10-30-01 & 6-21-02 Before & After Pictures
12-13-01 Curb Installation 2-13-02 Entire Track Asphalted!!! 7-18-02 Sparks Track Sign Finished
12-14-01 Click To See What The Big Storm Did 2-16-02 to 2-21-02 Pole Vault Boxes and Long/Triple Jump Frames Installed   7-06 New Discus Sector