  • 11-3-01 - Boxcar Removal
  • 11-12-01 - Curb Demo
  • 11-14-01 - High Jump/Shot Put Area Grading
  • 12-4-01 - New Curb Preparation
  • 12-11-01 - Digging Jump Pits and Start of Final Grade
  • 12-12-01 - Final Track Surface Grade and Jump Pits Grading
  • 12-13-01 - Curb Installation
  • 12-14-01 - Click To See What The Big Storm Did
  • 1-8-02 & 1-15-02 - Long and Triple Jump Runway Construction
  • 1-15-02 - Shot Put Ring Construction
  • 1-16-02 to 1-18-02 - East Retaining Wall Construction
  • 1-29-02 - Unsuitable Soil Fix and Asphalt Base
  • 1-30-02 to 2-4-02 - Asphalt Base
  • 2-11-02 - Fourth Patch and High Jump Asphalted
  • 2-13-02 - Entire Track Asphalted!!!
  • 2-16-02 to 2-21-02 - Pole Vault Boxes and Long/Triple Jump Frames Installed
  • 3-12-02 - New Fence And Rubber Surface Preparation
  • 3-14-02 to 3-25-02 - Preparing and Laying the Base Rubber
  • 3-26-02 - Spreading the sealing rubber
  • 3-29-02 to 3-31-02 - Top Layer
  • 4-7-02 to 4-8-02 - Track Lined
  • 10-30-01 & 6-21-02 - Before & After Pictures
  • 7-18-02 - Sparks Track Sign Finished
  • 7-06 - New Discus Sector
  • 7-11- Track Resurface